Home Publications Integration between a demo size post-combustion CO2 capture and full size power plant. An integral approach on energy penalty for different process options
Back to overview
PublicationIntegration between a demo size post-combustion CO2 capture and full size power plant. An integral approach on energy penalty for different process optionsDate12-11-2012 Author(s)Earl Goetheer WorkpackageWP 1.1 Post-Combustion Capture Location Publication numberCATO2-WP1.1A2-P06 TypeJournal Article Downloads3107 EventGHGT-11 Kyoto Download file File-size: 1.1 Mb |