Back to overview

Carsten Trapp 

  

CATO work description

Modelling and optimisation of pre-combustion capture at IGCC

Mail me»

Usergroups

Participating in CATO as: , CATO member, PhD student

Participation in work packages

Latest Publications

Type Title Secure Date
Paper
Performance and modelling of the pre-combustion capture pilot plant at the Buggenum IGCC
16-02-2015
Paper
Water-gas shift (WGS) operation of pre-combustion CO2 capture pilot plant at the Buggenum IGCC
16-02-2015
Thesis
Advances in Model-Based Design of Flexible and Prompt Energy Systems
25-08-2014
Report
Analysis of the dynamic performance of a MEA-based carbon capture unit for coal-fired power plants
30-10-2013
Poster
Operation and Optimisation of pre-combustion CO2 removal units integrated with IGCC power plants
03-07-2013
All publications in CATO
Back to overview